Citroen DS3 Airtec Motorsport Stage 2 Front Mount Intercooler
- Brands Airtec
- Product Code: Citroen ATINTP&C6
- Availability: In Stock at Manufacturer
- £631.70
-
£600.11
- Ex Tax: £500.09
Available Options
Finance available on all orders above £300.
AIRTEC has now added a great addition to it’s
growing range of performance intercoolers, in the way of this huge front mount
for the Citreon DS3.
Great addition to any standard
or remapped DS3s.
Features
- 60mm thick track proven bar and plate core, specked to Airtec
design
- Airtec Cast end tanks for improved Airflow and un-beatable strength
- Comes with silicone and alloy boost pipe connecting hoses –
includes stainless clips
- Fitting takes less 2-3 hours, comes with fitting instructions
- 3 year -limited mileage warranty
- Available in Pro-Series satin Black or Natural Silver
- AIRTEC Logo available @ no extra charge
Rolling road tested at AMD Essex.
Standard
intercooler:
Dyno cell ambient temperature: 19 degrees.
Run 1
In – 166 degrees
Out – 99 degrees
Run 2
In – 191 degrees
Out – 109 degrees
AIRTEC Stage 1 twin
pass intercooler:
Dyno cell ambient temperature: 19 degrees.
Run 1
In – 144 degrees
Out – 37 degrees
Run 2
In – 165 degrees
Out 42 degrees
Run 3
In – 170 degrees
Out – 46 degrees
On average the standard intercooler run at 208
bhp, seeing an 11bhp increase with the Airtec stage 1 twin pass intercooler
fitted.
Test car fitted with Miltek cat back exhaust + sports cat, Forge intake
system, stage 2 remap.
Huge surface area, but still allows plenty of
airflow to top section of the radiator, this is essential for hotter climate
countries.
Approximate
dimensions:
60mm thick
175mm Height
760mm width
Gloss Black, Race
Red, Performance Blue normally kept in stock.
Other colour hoses,
made to order.
Frozen White, Bright
Yellow, Grey, Kawasaki Green, Orange, Purple, Vivid Pink, Ultimate Green,
Nitrous Blue.
Please allow 2-4
weeks for delivery.
VIP
Motorsport is an official UK dealer of Airtec Motorsport products. All Airtec
intercoolers are built to order and have a rough lead time of up to two working
weeks.








